Get my roof price

Asphalt shingle roof replacement in southeastern Wisconsin

Tenpenny Roofing tears off your old roof down to the deck, fixes what's underneath, and installs a new architectural shingle roof built for Wisconsin winters. You get a written price within 24 hours of our visit, and most homes are finished in one day.

What's included in every roof

Part of the roofWhat we install
Tear-offAll existing layers removed down to the deck
DeckingInspected after tear-off. Damaged sheets replaced at the per-sheet rate in your contract, with photos
EavesTwo full courses of ice and water barrier, about 6 feet of protection up from the edge
RakesIce and water barrier up the rakes where the construction calls for it
ValleysIce and water barrier in every valley
FieldSynthetic underlayment over the rest of the deck
ShinglesArchitectural shingles from major manufacturers, including Atlas and GAF, picked with you for color and warranty. Impact-resistant shingles available as an upgrade
FlashingNew drip edge, pipe boots and step flashing. Chimney flashing replaced where it's failing
VentilationRidge and intake vents checked and matched to the attic
CleanupDumpster or trailer on site, gutters cleared, magnet sweep of the yard and driveway
PaperworkFinal photos, paid invoice, manufacturer warranty registered in your name

Why two courses at the eaves: ice dams form where the roof crosses the warm wall line. One course of barrier often stops short of where water backs up. Two courses carry protection about 6 feet up the roof.

The spec, on a real roof

Each step in the table above is in your contract, and each one shows up in your closeout photos.

Rotted roof decking replaced with new sheathing, next to two courses of ice and water barrier at the eave
Bad decking comes out first. Soft or rotted sheathing is cut out and replaced before anything goes down. You see photos before it's billed, at the per-sheet rate in your contract. Next to it: two courses of ice and water at the eave.
Ice and water barrier at the roof eave with synthetic underlayment above and drip edge at the gutter line
Ice and water at the eaves. Ice and water barrier runs up from the eave edge, about 6 feet up on our spec, where ice dams push water under shingles. Synthetic underlayment covers the rest of the deck, with new drip edge at the gutter line.
Roofing crew installing underlayment with shingle bundles staged across the roof
Install day. Tear-off, deck, barrier and shingles in one day. Materials are staged across the roof so the crew isn't waiting and your house isn't open overnight.
Ridge vent installed along the ridge of a new shingle roof
Ridge vent. A continuous ridge vent lets attic heat and moisture out, which protects the shingles and the deck from the inside.
Finished asphalt shingle roof with capped hips and chimneys
Finished. Hips and ridges capped, chimneys sealed, yard swept with a magnet. These are the kind of photos you get at closeout.

Installed by our crew.

Warranty

  • The shingle manufacturer's warranty, registered in your name when the job is done.
  • Enhanced system coverage when the roof qualifies as a complete system from one manufacturer, such as Atlas Signature Select on a full Atlas roof.
  • Your written price names the shingle, the color and the exact warranty your roof gets.

Upgrades

  • Impact-resistant shingles (some insurers discount premiums for impact-rated roofs; ask your agent)
  • Second-layer tear-off, garage roofs, chimney reflashing

Get your written roof price within 24 hours.

Get my roof price or call 414.253.2469